During the drilling process, Chesapeake’s cementing and casing program is used to protect water aquifers from drilling activities. The vertical portion of the wellbore is normally drilled with fresh water mud (through the freshwater aquifers) thus minimizing any risk of contamination. Steel casing and surrounding layers of concrete are then installed to isolate the well from the drinking water aquifers through which the wellbore penetrates. The depth at which the surface casing must extend is mandated by the applicable state regulatory agencies. In Texas, conductor casing is set approximately 60 to 80 feet below ground, while the surface casing is typically set to a depth of approximately 1,200 to 1,800 feet.
Additional strings of casing and tubing are set to provide additional layers of separation between the gas stream and the freshwater aquifer. The multiple layers of steel and cement which go into the construction of a natural gas well virtually eliminate the possibility of contamination to any freshwater zones1.
The state water regulatory agencies require documentation of drinking water aquifer intervals, the design and installation of surface casing relative to those intervals and the reporting of characteristics of the wellbore along with completion and production data.
Sourcing Reference:
1“Hydraulic fracturing considerations for natural gas wells of the Marcellus Shale” Arthur, Bohm, et al presented to Groundwater Protection Council, September 2008. pg 15